Projects

We believe we are part of something bigger, we have contributed to some of the worlds most iconic buildings but also providing robust environments for chickens to grow in.
No matter how big or small...
if it's made of steel we are proud of it
Scroll to explore

AMAZON – HULL

TR60+ Structural Floor Deck
(128,000m²)

AMAZON – LEEDS

TR60+ Structural Floor Deck
(13,000m²)

NETWORLD SPORTS HQ

Built Up Roof
(33,500m²)
Built Up Wall
(10,000m²)

HILLTHORN BUSINESS PARK

Protex® PRX-RS-02 Roof System
Mission XP40® (30,000m²)
Protex® PRX-WS-01 & 02 Wall Systems
SSAB Pural BT & Mission XP40® (20,000m²)

HBD – WAKEFIELD HUB

Protex® PRX-RS-02 Roof System
SSAB Hiarc Max (21,000m²)
Protex® PRX-WS-01, 02 & 04 Wall Systems
SSAB Hiarc Max & Granite® HDX (12,000m²)

EVO DEVELOPMENTS – EVO CORBY 60 & 169

Protex® PRX-RS-01 Roof System
Mission XP40® (17,000m²)
Protex® PRX-WS-01 & 02 Wall Systems
Mission XP40® & SSAB Hiarc Max (8,000m²)

EXETER LOGISTIC PARK

Protex® PRX-RS-01 Roof System
Mission XP40® (7,000m²)
Protex® PRX-WS-01 & 02 Wall Systems
Mission XP40® & Granite® HDX (4,000m²)

SeAH MONOPILE FACTORY

N1000R Roof Profile
(85,000m²)
N1000C Wall Profile
(60,000m² )
N14/3 Sinusoidal Profile
(15,000m²)

BECKINGHAM CADET TRAINING CENTRE

N14/3 Sinusodial Profile - SSAB Pural BT Zero™

SIEMENS TRAIN MANUFACTURING FACILITY

Protex® PRX-RS-02 Roof System
(20,000m²)
Protex® PRX-WS-01 & 02 Wall Systems
(14,000m²)

KONECT 62 – PHASE 1

Protex® PRX-RS-01 Roof System
Mission XP40® (27,000m²)

SEGRO – GREENFORD PARK

Protex® PRX-RS-01 Roof System
Mission XP40® (17,000m²)
Protex® PRX-WS-01 & 02 Wall Systems
Mission XP40® & SSAB Hiarc Max (8,000m²)

CITRUS GROUP – INTEGRA61 – DC5

Protex® PRX-RS-01 Roof System
Mission XP40® (24,000m²)
Protex® PRX-WS-01, 02 & 04 Wall Systems
Mission XP40® (10,000m²)

NEC NATIONAL EXHIBITION CENTRE

N1000C 0.7mm Greencoat Hiarc Max - 9500m2
N1000C 0.7mm Greencoat Hiarc Max Metallic Silver - 3500m2

THE SHARD LONDON

Structural Floor deck - 69,000m2
Manufactured and supplied by Firth Steels to SMD UK's profile specification.

TERMINAL 5, HEATHROW

Structural Floor Deck - 325,00m2
Manufactured and supplied by Firth Steels to SMD UK's profile specification.

THE WELSH ASSEMBLY

Structural Floor Deck - 3,700m2
Manufactured and supplied by Firth Steels to SMD UK's profile specification.

WARNER BROS. STUDIO, WATFORD

Structural Floor Deck - 2,200m2
Manufactured and supplied by Firth Steels to SMD UK's profile specification.

THE OLYMPIC STADIUM, LONDON

Structural Floor Deck - 10,00m2
Manufactured and supplied by Firth Steels to SMD UK's profile specification.

SUNSEEKER YACHTS, POOLE

Structural Floor Deck - 1,546m2
Manufactured and supplied by Firth Steels to SMD UK's profile specification.

DUBAI AIRPORT TERMINAL 3

Structural Floor Deck - 17,465m2
Manufactured and supplied by Firth Steels to SMD UK's profile specification.

SKI DUBAI

Structural Floor Deck - 6000m2
Manufactured and supplied by Firth Steels to SMD UK's profile specification.
1
Structural Floor Decking

AMAZON – HULL

Architect:SMR Architects
Product
TR60+ Structural Floor Deck
(128,000m²)

Amazon – Hull

Amazon Hull offers a state-of-the-art robotic fulfilment centre with a focus on increased operational efficiency, safety and delivery processes.

128,000m² Size
Structural Floor Decking

AMAZON – LEEDS

Architect:Michael Sparks
Product
TR60+ Structural Floor Deck
(13,000m²)

Amazon – Leeds 

The Amazon Robotics Fulfillment Centre utilises advanced technology across 3 floors to stow pick and ship custom orders.

The scheme is the largest distribution project in the Leeds City region offering a best-in-class facility.

13,000m² Size
Case Study

NETWORLD SPORTS HQ

Architect:C4 Architects
Contractor:Portal Construction NW
Client:Networld Sports HQ
Product
Built Up Roof
(33,500m²)
Built Up Wall
(10,000m²)

Networld Sports HQ

The vision of Net World Sports to create a world-class, modern workplace that looks great and can accommodate the rapid growth and ambitions of the business, has been achieved with the creation of the new HQ.

Coming from humble beginnings, the new 411,000 sq ft manufacturing, warehouse and office has been built just over a mile from the current site in Wrexham offering an onsite restaurant, bar, running track, tennis court, football pitch and gym.

411,000sq ft Size
Protex Classic®

HILLTHORN BUSINESS PARK

Architect:Hale Architecture
Contractor:GMI Construction
Client:L&G Investment & Sunderland City Council
Product
Protex® PRX-RS-02 Roof System
Mission XP40® (30,000m²)
Protex® PRX-WS-01 & 02 Wall Systems
SSAB Pural BT & Mission XP40® (20,000m²)

Hillthorn Business Park

Designed to support the needs of industrial, advanced manufacturing, storage and distribution businesses in the area and aid economic growth, the £60 million development site will complement the International Advanced Manufacturing Park and Turbine Business Park.

The 600,000 sq ft development, incorporating sustainable building technology is the North East’s largest speculative industrial scheme in over a decade. The first phase of the £60m Sunderland development has brought 1,600 jobs to the North East.

Very Good BREEAM
A EPC Rating
Installed PV Status
600,000sq ft Size
Protex Classic®

HBD – WAKEFIELD HUB

Architect:Ashton Smith Associates
Contractor:GMI Construction Group
Client:HBD & Yorkcourt Properties
Product
Protex® PRX-RS-02 Roof System
SSAB Hiarc Max (21,000m²)
Protex® PRX-WS-01, 02 & 04 Wall Systems
SSAB Hiarc Max & Granite® HDX (12,000m²)

HBD – WAKEFIELD HUB – PHOENIX HEALTHCARE

The state-of-the-art facility at Wakefield Hub was built on behalf of developer HBD and Yorkcourt for PHOENIX Group and will serve the NHS and pharmacies across the UK.

Constructed over 12 months the 260,000 sq ft facility is one of the largest regeneration projects of its kind in the North of England.

The purpose-built unit included the use of SSAB’s GreenCoat Hiarc Max coating to offer an A1 Non-combustible fire classification in line with the with the requirements for solar PV System installed.

Very Good BREEAM
A EPC Rating
Installed PV Status
260,000sq ft Size
Protex Classic®

EVO DEVELOPMENTS – EVO CORBY 60 & 169

Architect:PRC Architects
Main Contractor:HRC
Client:EVO Industrial
Product
Protex® PRX-RS-01 Roof System
Mission XP40® (17,000m²)
Protex® PRX-WS-01 & 02 Wall Systems
Mission XP40® & SSAB Hiarc Max (8,000m²)

EVO DEVELOPMENTS – EVO CORBY 60 & 169

EVO Corby is a dual unit site comprising of EVO 169 at 169,000sq ft and a second unit EVO 60 at 60,000sq ft. Situated in a central location offering easy access to the midlands and the north. Sustainability was at the forefront of the design offering BREEAM Excellent certification along with Net Zero Carbon in use and an EPC A+ Rating.

Excellent BREEAM
A+ EPC Rating
Installed PV Status
229,000sq ft Size
Protex Classic®

EXETER LOGISTIC PARK

Architect:AJA Architects
Contractor:ISG Construction
Client: Stoford
Product
Protex® PRX-RS-01 Roof System
Mission XP40® (7,000m²)
Protex® PRX-WS-01 & 02 Wall Systems
Mission XP40® & Granite® HDX (4,000m²)

Exeter Logistics Park

Located off the M5 close to Exeter Airport. Phase 1 consists of a distribution unit for Amazon of 90,000 sq ft, a 55,000 sq ft parcel distribution centre with integral office space on behalf of an end-user and a 28,500 sq ft unit developed for Forgeway. Each unit has been designed to offer a BREEAM ‘Very Good’ rating, Net Carbon Zero and the inclusion of Photovoltaic Panels within the roof design. The inclusion of Water & Daylight saving control, Electric Vehicle Charging and an EPC A Rating have looked to future-proof the site.

Very Good BREEAM
A EPC Rating
Installed PV Status
173,500sq ft Size
Case Study

SeAH MONOPILE FACTORY

Architect:Corstophine & Wright
Contractor:K2 Construction Management
Client:SeAH Wind
Product
N1000R Roof Profile
(85,000m²)
N1000C Wall Profile
(60,000m² )
N14/3 Sinusoidal Profile
(15,000m²)

The SeAH Monopile Facility

The facility stands at 40 metres tall, 800m long and over 200m wide. The factory is the largest in the world offering 1.13mn sq ft of high-quality factory space to manufacture the monopiles up to 120m in length and 15.5m in diameter.

This pioneering project will support the UK’s goal to fully decarbonise electricity by 2035 and signifies the commitment to advancing offshore wind technologies.

1.3Msq ft Size
Low Carbon Scheme

BECKINGHAM CADET TRAINING CENTRE

Architect:Maber Architects
Contractor:Triton Construction
Client:Beckingham Cadets
Product
N14/3 Sinusodial Profile - SSAB Pural BT Zero™

Beckingham Cadet Training Centre

Working closely with Maber Architects and Triton Construction, the Beckingham, Cadet Training Centre pushed the boundaries for sustainable construction in the UK.

The specification for the building envelope included SSAB Pural BT Zero™, the next generation of recycled steel. Produced using scrap steel fed into an electric arc furnace (EAF) powered using 100 & fossil-free electricity, the embodied carbon could be reduced by over 65% compared to the industry standard.

SSAB Pural BT Zero™ EAF Steel
Excellent DREEAM
Installed PV System
+65% Reduction in Carbon
Protex Classic®

SIEMENS TRAIN MANUFACTURING FACILITY

Architect:AHR Architects
Contractor:GMI Construction
Client:Siemens
Product
Protex® PRX-RS-02 Roof System
(20,000m²)
Protex® PRX-WS-01 & 02 Wall Systems
(14,000m²)

The Siemens Mobility Train Manufacturing Facility

This site has helped place Goole at the forefront of rail manufacturing in the UK. The state-of-the-art facility delivered an energy-efficient and cost-effective facility incorporating solar panels natural daylight and ventilation into the project.

Very Good BREEAM
A EPC Rating
Installed PV Status
248,000sq ft Size
Protex Classic®

KONECT 62 – PHASE 1

Architect:C4 Architects
Contractor:McLaren Construction
Client:Cole Waterhouse
Product
Protex® PRX-RS-01 Roof System
Mission XP40® (27,000m²)

Phase 1 of Konect62 offers one of the UK’s best-connected manufacturing and distribution opportunities.

The 375,000 sq ft first phase is split into 3 units comprising of 161,000, 151,000 & 61,000sq ft with Phase 2 expected to offer an additional 800,000sq ft of logistic space.

Both Phase 1 & Phase 2 have looked to utilise low-carbon building design and targeted BREEAM Excellent Ratings

Excellent BREEAM
A EPC Rating
Installed PV Status
290,000sq ft Size
Protex Classic®

SEGRO – GREENFORD PARK

Architect:SGP Architects
Contractor:Oakmont Construction
Client:Segro
Product
Protex® PRX-RS-01 Roof System
Mission XP40® (17,000m²)
Protex® PRX-WS-01 & 02 Wall Systems
Mission XP40® & SSAB Hiarc Max (8,000m²)

Segro’s Park – Fairway Drive offers 2 best-in-class carbon neutral unit’s designed to enable businesses to reduce their carbon footprint incorporating renewable energy and technologies into the build.

Unit A standing at 54,000 sq ft along side Unit B at 37,000 sq ft both targeted BREEAM Excellent along with an EPC A+ Rating.

Excellent BREEAM
A+ EPC Rating
Installed PV Status
91,000sq ft Size
Protex Classic®

CITRUS GROUP – INTEGRA61 – DC5

Architect:AJA Architects
Contractor:GMI Construction Group
Client: Citrus Group
Product
Protex® PRX-RS-01 Roof System
Mission XP40® (24,000m²)
Protex® PRX-WS-01, 02 & 04 Wall Systems
Mission XP40® (10,000m²)

Connect 289 – DC5

Situated within the 205-acre Integra 61 site filled a crucial void offering a 298,000sq ft stand-alone warehouse unit.

The plot is centrally located within the Integra 61 Scheme as the Connect Units comprise the largest speculatively developed industrial scheme seen in the North East for over a decade.

Excellent BREEAM
A EPC Rating
Installed PV Status
293,000sq ft Size
Case Study

NEC NATIONAL EXHIBITION CENTRE

Architect:Acivico
Contractor:CBRE
Product
N1000C 0.7mm Greencoat Hiarc Max - 9500m2
N1000C 0.7mm Greencoat Hiarc Max Metallic Silver - 3500m2
2018 YEAR
13,000 m2SQUARE
Case Study

THE SHARD LONDON

Architect:Renzo Piano of Broadway Malyan
Contractor:Mace
Product
Structural Floor deck - 69,000m2
Manufactured and supplied by Firth Steels to SMD UK's profile specification.
2015 YEAR
69,000 m2SQUARE
Case Study

TERMINAL 5, HEATHROW

Architect:Rogers Stirk Harbour
Contractor:Mace, AMEC, Laing O'Rourke, Morgan Vinci JV
Product
Structural Floor Deck - 325,00m2
Manufactured and supplied by Firth Steels to SMD UK's profile specification.
2014 YEAR
325,000 m2SQUARE
Case Study

THE WELSH ASSEMBLY

Architect:Rogers Stirk Harbour
Contractor:Mace, AMEC, Laing O'Rourke, Morgan Vinci JV
Product
Structural Floor Deck - 3,700m2
Manufactured and supplied by Firth Steels to SMD UK's profile specification.
2015 YEAR
3,700 m2SQUARE
Case Study

WARNER BROS. STUDIO, WATFORD

Architect:KMG Partnership
Contractor:KMG Partnership
Product
Structural Floor Deck - 2,200m2
Manufactured and supplied by Firth Steels to SMD UK's profile specification.
2016 YEAR
2,200 m2SQUARE
Case Study

THE OLYMPIC STADIUM, LONDON

Architect:Populous led by Philip Johnson
Contractor:Sir Robert McAlpine & Balfour Beatty
Product
Structural Floor Deck - 10,00m2
Manufactured and supplied by Firth Steels to SMD UK's profile specification.
2012 YEAR
10,000 m2SQUARE
Case Study

SUNSEEKER YACHTS, POOLE

Architect:Populous led by Philip Johnson
Contractor:Sir Robert McAlpine & Balfour Beatty
Product
Structural Floor Deck - 1,546m2
Manufactured and supplied by Firth Steels to SMD UK's profile specification.
2017 YEAR
1546 m2SQUARE
Case Study

DUBAI AIRPORT TERMINAL 3

Architect:Aéroports International de Paris (ADP) & Dar Al-Handasah.
Contractor:Sir Robert McAlpine & Balfour Beatty
Product
Structural Floor Deck - 17,465m2
Manufactured and supplied by Firth Steels to SMD UK's profile specification.
2017 YEAR
17 465 m2SQUARE
Case Study

SKI DUBAI

Architect: HOLFORD ASSOCIATES, Dubai,U.A.E
Contractor:Mace
Product
Structural Floor Deck - 6000m2
Manufactured and supplied by Firth Steels to SMD UK's profile specification.
2017 YEAR
6000 m2SQUARE